Project Planning & Design

General Topics

  • Understanding microclimates

  • Solar position and movement

  • Understanding site specific conditions and requirements

  • Reading topo maps

  • What you can and cannot do with historic buildings

  • Logic puzzles to meet project requirements

  • Brownfield Sites

    • What testing is required from what use

  • Assessing site specific issues 

    • Erosion risks

    • Microclimates

  • Foundation types and uses

    • Pier

    • Pile

    • Slab on grade

    • Cantilevered footing

    • Micropiles

    • Friction piles

    • Stepped footings

  • Understanding how mechanical affects other disciplines 

  • Pros and cons of different ground cover materials

    • Asphalt

    • Grass

    • Mulched bark

    • Wood decking

    • Crushed stones

    • Concrete pavers

    • Compacted gravel

    • Pervious concrete

  • Reading code 

    • Code exceptions 

    • Fire resistance rating tables

    • Occupant loads

    • Plumbing occupant loads

    • Door swing

  • Understanding items on budget and cost estimate lists

  • Calculate pricing and options for different finish options (including energy savings)

  • Site analysis for best expansion and renovation options for existing building 

  • Different fire suppression systems and when to use them

    • Dry pipe

    • Wet pipe

    • Deluge

    • Mist

    • Preaction

  • Pros and cons of different finish materials

    • Flooring

      • Terazzo

      • Carpet Tile

      • Ceramic Tile

      • Roll Carpet

      • LVP

      • Roll Vinyl

  • Floor / subfloor options

    • Raised accessible subfloor

    • Underfloor duct raceways

    • Floor boxes with acoustic wall panels 

  • Roof Options

    • Treated Cedar Shingles

    • Galvanized Standing Seam

    • Asphalt Composition Shingsles

    • EPDM

    • Modified Vitumen

    • Four-ply built up roof

  • Understanding different fire safety systems

    • Self Closing doors

    • Smoke dampers

  • Using the most stringent code between conflicting requirements

  • Use of natural lighting

    • Light shelves

    • Window sizes

    • Window mount locations

  • Site drainage, water movement

    • Area drains

    • Slotted concrete pavers

    • Subsurface perforated piping

    • Brick pavers with open joints

    • Retention basins

    • Detention basins 

    • Drop Inlet

    • Catch Basin

    • Trench Drain

  • Waterproofing details

  • Passive environmental control methods in different climates

    • Clusters and rows in cold climates

  • Understanding roof drainage

    • Where to place crickets

  • Understanding solar panel placement

  • Water supply systems

    • Upfeed Distribution

    • Downfeed Distribution

    • Pumped upfeed distribution

  • Floor area ratio and how to apply it

    • Max. buildable area

    • Max number of floors

  • Allowable area calcs

  • Occupant Load Calcs

  • Plumbing Calcs

  • Parking Counts

  • Calculating stair risers required

  • Structural Member Types

    • Steel Open Web Joists

    • Engineered Glue Lam

    • Solid wood joist and girders

    • 2 way conc. Flat Slab

    • 2 way conc waffle slab

    • 1 way conc. Slab and beam

  • Structural Systems

    • Cross braced frames

    • Shear walls

    • Rigid frame

    • Gang-nail trusses 

    • Composite I-joists 

    • Glulam beams

    • T&G decking

    • Heavy Timber

    • Plywood decking

    • Cast-in-place concrete (reinforced and not reinforce)

      • Columns 

      • Flooring

    • Tilt up concrete

      • walls

    • Structural steel

      • Girders

      • Beams

      • Joists

      • Steel form deck

  • Use of louvers and light shelves

  • Required separation between occupancies 

  • Advantages and disadvantages of different fixtures and finishes

  • Analyzing issues resulting from changes

  • Building shapes that are more or less beneficial in different climates and other issues (earthquake, wind, solar gain)

  • Efficient room layouts (restroom)

  • Finishes of metals and their advantages

  • Passive heating and cooling strategies

    • Orientation

    • High and low opening spaces

  • Types of elevators and their advantages

    • Geared Traction

    • Gearless Traction

    • Holeless Hydraulic

    • Conventional Hydrolic

  • Types of portable fire extinguishers and when to use them

  • Ways to minimize condensation

  • Geo-exchange heat pump types

    • Vertical open loop

    • Vertical closed loop

    • Horizontal open loop

    • Horizontal closed loop

  • Compare costs of different materials

  • Identifying where ADA updates are needed

    • Calculating ramp lenghts

  • Egress sizing calcs

  • Knowing which regulatory bodies are needed for each project

  • Types of HVAC systems

    • Constant air volume

    • Variable air volume

    • Terminal reheat

    • Dual duct

  • Equipment placement on site or on buildings

  • Calculate air exchange rate of different systems 

    • Mechanical systems

    • Windows

  • Understanding how electrical systems get changed by project changes

  • What sources to find site info

    • USGS maps

    • Zoning Maps

    • Topo maps

    • Geotech investigations

    • FEMA maps

    • USDA surveys

    • FAA docs

  • Misc stuff / general stuff to be familiar with

    • Wire Cable Hanging System

    • Geothermal systems

    • Photovoltaic systems

    • Insulation / R-Value

    • Geotech reports

    • Solar diagrams

    • Stormwater runoff records

    • Easements and setbacks







References and Resources: